BP Pulse · EV charging site
New Cross Gate Depot
New Cross Gate Depot, Juno Way, SE14 5RW
New Cross Gate Depot is an EV charging site in New Cross, Greater London, run by BP Pulse. Both of its sockets are 7 kW Type 2. Amp Map measured 0% uptime here over the last 30 days. 198 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Clifton Road, 0.5 miles away.
Status
Out of service
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- 11916
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at New Cross Gate Depot (BP Pulse)?
Up to 7 kW AC via Type 2.
How many charging sockets does New Cross Gate Depot (BP Pulse) have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
How reliable is New Cross Gate Depot (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates New Cross Gate Depot?
New Cross Gate Depot is on the BP Pulse network.
Where is the nearest charger with 50 kW or more to New Cross Gate Depot (BP Pulse)?
Clifton Road is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at New Cross Gate Depot (BP Pulse)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at New Cross Gate Depot (BP Pulse)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at New Cross Gate Depot (BP Pulse)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 7 Mercury Way, Opp. Junc. Myers Lane
- ubitricity Distributed Energy Systems UK Ltd. 53 Wrigglesworth Street
- ubitricity Distributed Energy Systems UK Ltd. 29 Camplin Street
- ubitricity Distributed Energy Systems UK Ltd. 14 Childers Street, opp.
- ubitricity Distributed Energy Systems UK Ltd. 22 Arklow Road
- Opposite 27-55 Manor Grove
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 7 Mercury Way, Opp. Junc. Myers Lane · 67p per kWh · 5 kW · 0.2 mi