Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Outside Costa Coffee

32 Market Pl, Olney, Newport Pagnell, MK46 4AJ

Outside Costa Coffee is an EV charging site in Newport Pagnell, Milton Keynes, run by BP Pulse. Both of its sockets are 7 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 50% uptime and recorded 61 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Queens Avenue Car Park (BP Pulse), 4.6 miles away.

Status

1 of 2 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW2 connectors · 65p per kWh1 free1 out of service
VPP4015040% reliabilityOut of order
VPP401654100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
VPP401504

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Outside Costa Coffee (BP Pulse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Outside Costa Coffee (BP Pulse)?

Up to 7 kW AC via Type 2.

How many charging sockets does Outside Costa Coffee (BP Pulse) have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Outside Costa Coffee (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 7 am. The live status on this page shows what is free before you set off.

How reliable is Outside Costa Coffee (BP Pulse)?

Amp Map measured 50% uptime here from recorded live status over the last 30 days, across 61 observed charging sessions.

Who operates Outside Costa Coffee?

Outside Costa Coffee is on the BP Pulse network.

Where is the nearest charger with 50 kW or more to Outside Costa Coffee (BP Pulse)?

Queens Avenue Car Park (BP Pulse) is 4.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Outside Costa Coffee (BP Pulse)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Outside Costa Coffee (BP Pulse)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Outside Costa Coffee (BP Pulse)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.