Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Winckley Square Preston

On street parking, Winckley Square, Preston, PR1 3JJ

Winckley Square Preston is an EV charging site in Preston, Lancashire, run by BP Pulse. All 8 of its sockets are 7 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 10 pm, and Amp Map measured 43% uptime and recorded 62 charging sessions here over the last 30 days. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lawson Street Preston (BP Pulse), 0.4 miles away.

Status

4 of 8 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW8 connectors · 65p per kWh4 free4 out of service
11777100% reliabilityAvailable
11777100% reliabilityAvailable
11783100% reliabilityAvailable
11783100% reliabilityAvailable
117840% reliabilityOut of order
117840% reliabilityOut of order
117850% reliabilityOut of order
117850% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
11777

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Winckley Square Preston (BP Pulse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Winckley Square Preston (BP Pulse)?

Up to 7 kW AC via Type 2.

How many charging sockets does Winckley Square Preston (BP Pulse) have?

8 charging sockets: 8 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Winckley Square Preston (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 pm and quietest around 8 am. The live status on this page shows what is free before you set off.

How reliable is Winckley Square Preston (BP Pulse)?

Amp Map measured 43% uptime here from recorded live status over the last 30 days, across 62 observed charging sessions.

Who operates Winckley Square Preston?

Winckley Square Preston is on the BP Pulse network.

Where is the nearest charger with 50 kW or more to Winckley Square Preston (BP Pulse)?

Lawson Street Preston (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Winckley Square Preston (BP Pulse)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Winckley Square Preston (BP Pulse)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Winckley Square Preston (BP Pulse)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.