BP Pulse · EV charging site
Masterpark Chinatown Car Park
Newport Place, Soho, WC2H 7PU
Masterpark Chinatown Car Park is an EV charging site in Soho, Greater London, run by BP Pulse. It has a single socket, with CCS and CHAdeMO at up to 50 kW. 205 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is QA Test Station, 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Phone (from Open Charge Map)
- 020 7402 5916
- Notes
- Call for availability and application form
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Masterpark Chinatown Car Park (BP Pulse)?
Up to 50 kW DC via BS1363 3 Pin 13 Amp, Type 2, CCS, CHAdeMO.
How many charging sockets does Masterpark Chinatown Car Park (BP Pulse) have?
1 charging socket: 10 × 3 kW BS1363 3 Pin 13 Amp, 2 × 7 kW Type 2, 2 × 43 kW Type 2, 2 × 50 kW CCS, 2 × 50 kW CHAdeMO.
Who operates Masterpark Chinatown Car Park?
Masterpark Chinatown Car Park is on the BP Pulse network. For site issues, the operator lists 020 7402 5916.
Where is the nearest other charger with 50 kW or more to Masterpark Chinatown Car Park (BP Pulse)?
QA Test Station is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Masterpark Chinatown Car Park (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Masterpark Chinatown Car Park (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Masterpark Chinatown Car Park (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 12 Upper Saint Martin's Lane
- ubitricity Distributed Energy Systems UK Ltd. Bedford Court, Junc. Bedfordbury
- NCP Brewer Street - Chargepost 1
- ubitricity Distributed Energy Systems UK Ltd. 29 Soho Square, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 20 New Compton Street
- ubitricity Distributed Energy Systems UK Ltd. 35 Soho Square
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 12 Upper Saint Martin's Lane · 56p per kWh · 5 kW · 0.1 mi