Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Masterpark Chinatown Car Park

Newport Place, Soho, WC2H 7PU

Masterpark Chinatown Car Park is an EV charging site in Soho, Greater London, run by BP Pulse. It has a single socket, with CCS and CHAdeMO at up to 50 kW. 205 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is QA Test Station, 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 17 May 2011Last verified 17 May 2011

Connectors

CCS · 50 kW2 connectors
CHAdeMO · 50 kW2 connectors
Type 2 · 43 kW2 connectors
Type 2 · 7 kW2 connectors
BS1363 3 Pin 13 Amp · 3 kW10 connectors

Site information

Operator
BP Pulse
Opening hours
Not published
Phone (from Open Charge Map)
020 7402 5916
Notes
Call for availability and application form

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Masterpark Chinatown Car Park (BP Pulse)?

Up to 50 kW DC via BS1363 3 Pin 13 Amp, Type 2, CCS, CHAdeMO.

How many charging sockets does Masterpark Chinatown Car Park (BP Pulse) have?

1 charging socket: 10 × 3 kW BS1363 3 Pin 13 Amp, 2 × 7 kW Type 2, 2 × 43 kW Type 2, 2 × 50 kW CCS, 2 × 50 kW CHAdeMO.

Who operates Masterpark Chinatown Car Park?

Masterpark Chinatown Car Park is on the BP Pulse network. For site issues, the operator lists 020 7402 5916.

Where is the nearest other charger with 50 kW or more to Masterpark Chinatown Car Park (BP Pulse)?

QA Test Station is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Masterpark Chinatown Car Park (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Masterpark Chinatown Car Park (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Masterpark Chinatown Car Park (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 17 May 2011

Amp Map does not take payment. You pay the operator.