BP Pulse · EV charging site
Rankin SF Connect
Keighley Road, Bingley, BD16 2RD
Rankin SF Connect is an EV charging site in Bingley, Bradford, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 95% uptime and recorded 293 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Wellington Street Car Park (GeniePoint), 0.3 miles away.
Status
2 of 2 available
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000159
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Rankin SF Connect (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does Rankin SF Connect (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Rankin SF Connect (BP Pulse) open 24/7?
Yes - Rankin SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.
When is Rankin SF Connect (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Rankin SF Connect (BP Pulse)?
Amp Map measured 95% uptime here from recorded live status over the last 30 days, across 293 observed charging sessions.
Who operates Rankin SF Connect?
Rankin SF Connect is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Rankin SF Connect (BP Pulse)?
Wellington Street Car Park (GeniePoint) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Rankin SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rankin SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Rankin SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Wellington Street Car Park
- Victoria St Car Park, Bingley 1
- Charger 1
- Herbert Street, Cottingley 1
- Shell Recharge Shell Saltaire
- Wilsden Royd House 1
- Cheapest nearby
- Shell Recharge Shell Saltaire · 89p per kWh · 150 kW · 2.2 mi