# Richmond Road Car Park · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-richmond-road-car-park-towcester-uk

Richmond Road Car Park is an EV charging site in Northampton, West Northamptonshire, run by BP Pulse. All 6 of its sockets are 7 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 0% uptime here over the last 30 days.

## Status

Under maintenance at 22 Nov 2026, 22:36 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Richmond Road Car Park, Richmond Road,4 Richm, NN12 6EX
- **Area:** Northampton, West Northamptonshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.13074, -0.98844

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 6 | £0.65/kWh | Out of service |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Not published
- **Payment:** In the BP Pulse app; RFID card

## Common questions

### How much does it cost to charge at Richmond Road Car Park (BP Pulse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Richmond Road Car Park (BP Pulse)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Richmond Road Car Park (BP Pulse) have?

6 charging sockets: 6 × 7 kW Type 2. Live per-socket availability is shown on this page.

### When is Richmond Road Car Park (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 11 am. The live status on this page shows what is free before you set off.

### How reliable is Richmond Road Car Park (BP Pulse)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

### Who operates Richmond Road Car Park?

Richmond Road Car Park is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Richmond Road Car Park (BP Pulse)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Richmond Road Car Park (BP Pulse)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Richmond Road Car Park (BP Pulse)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Northampton](https://ampmap.co.uk/chargers/united-kingdom/west-northamptonshire/northampton)
- [Cheapest charging in Northampton](https://ampmap.co.uk/chargers/united-kingdom/west-northamptonshire/northampton/cheapest)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Sponne Arcade Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-sponne-arcade-car-park-uk) - Type 2 7 kW · Richmond Road Car Park, Richmond Road · From 65p/kWh
- [Pod Point Tesco Superstore - Towcester](https://ampmap.co.uk/charger/pod-point-tesco-superstore-towcester-uk) - Type 2 7 kW · Old Tiffield Road · From 44.4p/kWh
- [Parkers Kitchens](https://ampmap.co.uk/charger/parkers-kitchens-uk) - Type 2 22 kW · Parker Kitchens
- [Shell Recharge Shell Towcester](https://ampmap.co.uk/charger/shell-recharge-shell-towcester-uk) - CCS 175 kW, CHAdeMO 70 kW · Watling street · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-richmond-road-car-park-towcester-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
