# Rotherwas Service Station · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-rotherwas-service-station-uk

Rotherwas Service Station is an EV charging site in Hereford, Herefordshire, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS.

## Status

Offline at 22 Nov 2026, 21:01 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Holme Lacy Road, HR2 6BQ
- **Area:** Hereford, Herefordshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.03779, -2.68437

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | Not listed | Status unknown |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Rotherwas Service Station (BP Pulse)?

Up to 150 kW DC via CCS.

### How many charging sockets does Rotherwas Service Station (BP Pulse) have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

### Is Rotherwas Service Station (BP Pulse) open 24/7?

Yes - Rotherwas Service Station (BP Pulse) is open 24 hours a day, 7 days a week.

### Who operates Rotherwas Service Station?

Rotherwas Service Station is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Rotherwas Service Station (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rotherwas Service Station (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Rotherwas Service Station (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Hereford](https://ampmap.co.uk/chargers/united-kingdom/herefordshire/hereford)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Pod Point NMITE - Skylon Campus](https://ampmap.co.uk/charger/pod-point-nmite-skylon-campus-uk) - Type 2 7 kW · Rotherwas Industrial Estate · From 44.4p/kWh
- [Texaco Ledbury Road · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-texaco-ledbury-road-uk) - CHAdeMO 50 kW, Type 2 50 kW · Ledbury Road
- [MFG Texaco Ledbury Road · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-mfg-texaco-ledbury-road-uk) - CCS 50 kW, CHAdeMO 50 kW · Ledbury Road
- [Venns Close Car Park Hereford - 70539](https://ampmap.co.uk/charger/venns-close-car-park-hereford-70539-uk) - Type 2 4 kW · Venns Close
- [St Martin's Car Park · POGO](https://ampmap.co.uk/charger/pogo-st-martin-s-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · St Martins Avenue · From 56p/kWh
- [Morrisons Hereford · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-hereford-uk) - CCS 50 kW, CHAdeMO 50 kW · Station Approach

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-rotherwas-service-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
