Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Saltergate Multi-Storey Car Park

Saltergate Multi-Storey Car Park, 61-63 Salte, Chesterfield, S40 1UJ

Saltergate Multi-Storey Car Park is an EV charging site in Chesterfield, Derbyshire, run by BP Pulse. All 6 of its sockets are 7 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 100% uptime and recorded 56 charging sessions here over the last 30 days. 12 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Soresby Street Car Park (BP Pulse), 30 yards away.

Status

4 of 6 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

Type 2 · 7 kW6 connectors · 65p per kWh4 free2 in use
12452100% reliabilityCharging
12452100% reliabilityAvailable
12764100% reliabilityAvailable
12764100% reliabilityAvailable
12766100% reliabilityCharging
12766100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
12452

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Saltergate Multi-Storey Car Park (BP Pulse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Saltergate Multi-Storey Car Park (BP Pulse)?

Up to 7 kW AC via Type 2.

How many charging sockets does Saltergate Multi-Storey Car Park (BP Pulse) have?

6 charging sockets: 6 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Saltergate Multi-Storey Car Park (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 8 am. The live status on this page shows what is free before you set off.

How reliable is Saltergate Multi-Storey Car Park (BP Pulse)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 56 observed charging sessions.

Who operates Saltergate Multi-Storey Car Park?

Saltergate Multi-Storey Car Park is on the BP Pulse network.

Where is the nearest charger with 50 kW or more to Saltergate Multi-Storey Car Park (BP Pulse)?

Soresby Street Car Park (BP Pulse) is 30 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Saltergate Multi-Storey Car Park (BP Pulse)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Saltergate Multi-Storey Car Park (BP Pulse)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Saltergate Multi-Storey Car Park (BP Pulse)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.