# Saxon Mill · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-saxon-mill-uk

Saxon Mill is an EV charging site in Warwick, Warwickshire, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 98% uptime and recorded 110 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 15:50 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Guys Cliffe, Coventry Road, CV34 5YN
- **Area:** Warwick, Warwickshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.30097, -1.57493

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Saxon Mill (BP Pulse)?

Up to 50 kW DC via CCS.

### How many charging sockets does Saxon Mill (BP Pulse) have?

2 charging sockets: 2 × 50 kW CCS. Live per-socket availability is shown on this page.

### Is Saxon Mill (BP Pulse) open 24/7?

Yes - Saxon Mill (BP Pulse) is open 24 hours a day, 7 days a week.

### When is Saxon Mill (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is Saxon Mill (BP Pulse)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 110 observed charging sessions.

### Who operates Saxon Mill?

Saxon Mill is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Saxon Mill (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Saxon Mill (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Saxon Mill (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Warwick](https://ampmap.co.uk/chargers/united-kingdom/warwickshire/warwick)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Guyscliffe SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-guyscliffe-sf-connect-uk) - CCS 150 kW · Coventry Road
- [EVC The Warwickshire · Roam Charging](https://ampmap.co.uk/charger/roam-charging-evc-the-warwickshire-uk) - Type 2 22 kW · Leek Wootton
- [The Warwickshire Golf Course · Roam Charging](https://ampmap.co.uk/charger/roam-charging-the-warwickshire-golf-course-uk) - Type 2 22 kW · Leek Wootton
- [Ecofix · Alfapower](https://ampmap.co.uk/charger/alfapower-ecofix-uk) - CCS 22 kW, CHAdeMO 22 kW · Millers Road
- [Pod Point McDonald's - Warwick](https://ampmap.co.uk/charger/pod-point-mcdonald-s-warwick-uk) - Type 2 3 kW · Emscote Road · Free to use
- [Pod Point Tesco Superstore - Warwick](https://ampmap.co.uk/charger/pod-point-tesco-superstore-warwick-uk) - CCS / CHAdeMO 50 kW, Type 2 22 kW · Emscote Road · From 44.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-saxon-mill-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
