BP Pulse · EV charging site
St Leonards SF Connect
176 Ringwood Road, Ferndown, BH24 2NR
St Leonards SF Connect is an EV charging site in Ferndown, Dorset, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 88% uptime and recorded 162 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Woodman, Ringwood (Osprey Charging), 1.1 miles away.
Status
2 of 2 available
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000194
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at St Leonards SF Connect (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does St Leonards SF Connect (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is St Leonards SF Connect (BP Pulse) open 24/7?
Yes - St Leonards SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.
When is St Leonards SF Connect (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is St Leonards SF Connect (BP Pulse)?
Amp Map measured 88% uptime here from recorded live status over the last 30 days, across 162 observed charging sessions.
Who operates St Leonards SF Connect?
St Leonards SF Connect is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to St Leonards SF Connect (BP Pulse)?
Woodman, Ringwood (Osprey Charging) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at St Leonards SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St Leonards SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at St Leonards SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Forest Edge Holiday Park
- Normandy Way
- Woodman, Ringwood
- Pod Point Lewis Concrete Ltd
- Pod Point Oakdene Forest Park
- Esso West Moors - Ferndown
- Cheapest nearby
- Pod Point Forest Edge Holiday Park · 45.6p per kWh · 7 kW · 0.8 mi