# Stonebridge SF Connect · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-stonebridge-sf-connect-uk

Stonebridge SF Connect is an EV charging site in Coventry, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 55% uptime and recorded 333 charging sessions here over the last 30 days.

## Status

Under maintenance at 22 Nov 2026, 16:45 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Stonebridge Highway, CV3 6RQ
- **Area:** Coventry, United Kingdom
- **Coordinates (latitude, longitude):** 52.37886, -1.51555

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | Not listed | Out of service |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Stonebridge SF Connect (BP Pulse)?

Up to 150 kW DC via CCS.

### How many charging sockets does Stonebridge SF Connect (BP Pulse) have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

### Is Stonebridge SF Connect (BP Pulse) open 24/7?

Yes - Stonebridge SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.

### When is Stonebridge SF Connect (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Stonebridge SF Connect (BP Pulse)?

Amp Map measured 55% uptime here from recorded live status over the last 30 days, across 333 observed charging sessions.

### Who operates Stonebridge SF Connect?

Stonebridge SF Connect is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Stonebridge SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Stonebridge SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Stonebridge SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Coventry](https://ampmap.co.uk/chargers/united-kingdom/coventry/coventry)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Miller & Carter Coventry · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-miller-and-carter-coventry-uk) - CCS 50 kW · Kenpas Highway
- [Meriden Street 2 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-meriden-street-2-uk) - Type 2 7 kW · Meriden Street 2
- [Fenside Avenue 1 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-fenside-avenue-1-uk) - Type 2 7 kW · Fenside Avenue
- [Charminster Drive 3 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-charminster-drive-3-uk) - Type 2 7 kW · Charminster Drive
- [Postbridge Road · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-postbridge-road-uk) - Type 2 7 kW · Postbridge Road
- [Charminster Drive 2 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-charminster-drive-2-uk) - Type 2 7 kW · Charminster Drive

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-stonebridge-sf-connect-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.