Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

The Brache

The Brache ,Maulden, Ampthill, MK45 2DZ

The Brache is an EV charging site in Ampthill, Central Bedfordshire, run by BP Pulse. All 8 of its sockets are 7 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 40% uptime and recorded 21 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Superstore - Flitwick, 2.3 miles away.

Status

4 of 8 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW8 connectors · 65p per kWh4 free4 out of service
FC18911100% reliabilityAvailable
FC18911100% reliabilityAvailable
FC189120% reliabilityOut of order
FC189120% reliabilityOut of order
FC189140% reliabilityOut of order
FC189140% reliabilityOut of order
FC18915100% reliabilityAvailable
FC18915100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
FC18911

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at The Brache (BP Pulse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at The Brache (BP Pulse)?

Up to 7 kW AC via Type 2.

How many charging sockets does The Brache (BP Pulse) have?

8 charging sockets: 8 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is The Brache (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 8 am. The live status on this page shows what is free before you set off.

How reliable is The Brache (BP Pulse)?

Amp Map measured 40% uptime here from recorded live status over the last 30 days, across 21 observed charging sessions.

Who operates The Brache?

The Brache is on the BP Pulse network.

Where is the nearest charger with 50 kW or more to The Brache (BP Pulse)?

Pod Point Tesco Superstore - Flitwick is 2.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at The Brache (BP Pulse)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Brache (BP Pulse)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at The Brache (BP Pulse)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.