BP Pulse · EV charging site
The Cleveland Tontine
The Cleveland Tontine, Staddlebridge House, Northallerton, DL6 3JB
The Cleveland Tontine is an EV charging site in Northallerton, North Yorkshire, run by BP Pulse. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 100% uptime and recorded 74 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Willow Beck, Northallerton (Osprey Charging), 5.7 miles away.
Status
In use
Checking status…
Connectors
CCS or CHAdeMO · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- 24814
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | 89p per kWh |
| CHAdeMO | 50 kW | 89p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Cleveland Tontine (BP Pulse)?
The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at The Cleveland Tontine (BP Pulse)?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does The Cleveland Tontine (BP Pulse) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
When is The Cleveland Tontine (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is The Cleveland Tontine (BP Pulse)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 74 observed charging sessions.
Who operates The Cleveland Tontine?
The Cleveland Tontine is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to The Cleveland Tontine (BP Pulse)?
Willow Beck, Northallerton (Osprey Charging) is 5.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Cleveland Tontine (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Cleveland Tontine (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Cleveland Tontine (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.