BP Pulse · EV charging site
Tree Cathedral Car Park
Tree Cathedral Car Park, Livingstone Drive, Milton Keynes, MK15 0DT
Tree Cathedral Car Park is an EV charging site in Milton Keynes, run by BP Pulse. All 3 of its sockets are 50 kW CCS, and the published price is £0.89 per kWh. Amp Map measured 0% uptime here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is PremierInn (GeniePoint), 0.1 miles away.
Status
Out of service
Checking status…
Connectors
CCS · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- 24740
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | 89p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Tree Cathedral Car Park (BP Pulse)?
The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Tree Cathedral Car Park (BP Pulse)?
Up to 50 kW DC via CCS.
How many charging sockets does Tree Cathedral Car Park (BP Pulse) have?
3 charging sockets: 3 × 50 kW CCS. Live per-socket availability is shown on this page.
How reliable is Tree Cathedral Car Park (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Tree Cathedral Car Park?
Tree Cathedral Car Park is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Tree Cathedral Car Park (BP Pulse)?
PremierInn (GeniePoint) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Tree Cathedral Car Park (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tree Cathedral Car Park (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tree Cathedral Car Park (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- PremierInn
- Willen Lake North Car Park
- Willen Lake South Car Park
- Campbell Park Pavilion Car Park
- Pattison Lane
- Mercedes Benz HQ
- Cheapest nearby
- Willen Lake North Car Park · 65p per kWh · 50 kW · 0.2 mi