Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Trowell Road - Nottingham City Council

110 Trowell Road, Basford, NG8 2DH

Trowell Road - Nottingham City Council is an EV charging site in Basford, Nottingham, run by BP Pulse. Its 14 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the published price is £0.89 per kWh. Amp Map measured 0% uptime here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Birchover Community Centre, Nottingham (Charge Your Car), 0.4 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 50 kW5 connectors · 89p per kWhOut of service
UC252270% reliabilityOut of order
UC252280% reliabilityOut of order
UC252300% reliabilityOut of order
UC252310% reliabilityOut of order
UC252320% reliabilityOut of order
CHAdeMO · 50 kW5 connectors · 89p per kWhOut of service
UC252270% reliabilityOut of order
UC252280% reliabilityOut of order
UC252300% reliabilityOut of order
UC252310% reliabilityOut of order
UC252320% reliabilityOut of order
Type 2 · 44 kW4 connectors · 89p per kWhOut of service
UC252270% reliabilityOut of order
UC252280% reliabilityOut of order
UC252300% reliabilityOut of order
UC252320% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
UC25227

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CHAdeMO50 kW89p per kWh
CCS50 kW89p per kWh
Type 244 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Trowell Road - Nottingham City Council (BP Pulse)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Trowell Road - Nottingham City Council (BP Pulse)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

How many charging sockets does Trowell Road - Nottingham City Council (BP Pulse) have?

14 charging sockets: 5 × 50 kW CHAdeMO, 4 × 44 kW Type 2, 5 × 50 kW CCS. Live per-socket availability is shown on this page.

How reliable is Trowell Road - Nottingham City Council (BP Pulse)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Trowell Road - Nottingham City Council?

Trowell Road - Nottingham City Council is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Trowell Road - Nottingham City Council (BP Pulse)?

Birchover Community Centre, Nottingham (Charge Your Car) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Trowell Road - Nottingham City Council (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Trowell Road - Nottingham City Council (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Trowell Road - Nottingham City Council (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.