BP Pulse · EV charging site
Warren Weir Lakeside Venue
Warren Weir Lakeside Venue, Luton Hoo Hotel, LU1 3TW
Warren Weir Lakeside Venue is an EV charging site in Luton, run by BP Pulse. Both of its sockets are 4 kW Type 2, and the published price is £0.65 per kWh. Amp Map measured 39% uptime here over the last 30 days. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is The Arc, Clowne (BP Pulse), 1.4 miles away.
Status
Out of service
Checking status…
Connectors
Type 2 · 4 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- 11156
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 4 kW | 65p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Warren Weir Lakeside Venue (BP Pulse)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Warren Weir Lakeside Venue (BP Pulse)?
Up to 4 kW AC via Type 2.
How many charging sockets does Warren Weir Lakeside Venue (BP Pulse) have?
2 charging sockets: 2 × 4 kW Type 2. Live per-socket availability is shown on this page.
How reliable is Warren Weir Lakeside Venue (BP Pulse)?
Amp Map measured 39% uptime here from recorded live status over the last 30 days.
Who operates Warren Weir Lakeside Venue?
Warren Weir Lakeside Venue is on the BP Pulse network.
Where is the nearest charger with 50 kW or more to Warren Weir Lakeside Venue (BP Pulse)?
The Arc, Clowne (BP Pulse) is 1.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Warren Weir Lakeside Venue (BP Pulse)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Warren Weir Lakeside Venue (BP Pulse)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Warren Weir Lakeside Venue (BP Pulse)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.