BP Pulse · EV charging site
Willingdon SF Connect
Eastbourne Rd, Willingdon, BN20 9LA
Willingdon SF Connect is an EV charging site in Eastbourne, East Sussex, run by BP Pulse and open 24 hours a day. Its 2 sockets reach up to 150 kW, with CCS at the top speed. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 73% uptime and recorded 73 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Rodmill (Eastbourne) (evyve), 1.4 miles away.
Status
2 of 2 available
Checking status…
Connectors
CCS · 150 kW
CHAdeMO · 100 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPU0151
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Willingdon SF Connect (BP Pulse)?
Up to 150 kW DC via CHAdeMO, CCS.
How many charging sockets does Willingdon SF Connect (BP Pulse) have?
2 charging sockets: 1 × 100 kW CHAdeMO, 1 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Willingdon SF Connect (BP Pulse) open 24/7?
Yes - Willingdon SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.
When is Willingdon SF Connect (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Willingdon SF Connect (BP Pulse)?
Amp Map measured 73% uptime here from recorded live status over the last 30 days, across 73 observed charging sessions.
Who operates Willingdon SF Connect?
Willingdon SF Connect is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Willingdon SF Connect (BP Pulse)?
Rodmill (Eastbourne) (evyve) is 1.4 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Willingdon SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Willingdon SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Willingdon SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Metro - Eastbourne Hampden Park
- Rodmill (Eastbourne)
- Morrisons Eastbourne
- Morrisons Eastbourne
- Bannatyne Health Club & Spa
- Pod Point Yeomans - Eastbourne Nissan
- Cheapest nearby
- Pod Point Yeomans - Eastbourne Nissan · Free · 7 kW · 1.7 mi