BP Pulse · EV charging site
Wrythe SF Connect
Green Wrythe Lane, Carshalton, SM5 2DR
Wrythe SF Connect is an EV charging site in Carshalton, Greater London, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Amp Map measured 0% uptime here over the last 30 days. 44 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell St Helier, 0.5 miles away.
Status
Out of service
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000108
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Wrythe SF Connect (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does Wrythe SF Connect (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Wrythe SF Connect (BP Pulse) open 24/7?
Yes - Wrythe SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.
How reliable is Wrythe SF Connect (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Wrythe SF Connect?
Wrythe SF Connect is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Wrythe SF Connect (BP Pulse)?
Shell Recharge Shell St Helier is 0.5 miles away in a straight line, with up to 175 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wrythe SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wrythe SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wrythe SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 1 Saint Johns Road, junc Green Wrythe Lane
- ubitricity Distributed Energy Systems UK Ltd. 70 Denmark Road
- ubitricity Distributed Energy Systems UK Ltd. 75 Denmark Road, opp. Leeds Court
- ubitricity Distributed Energy Systems UK Ltd. 46 Mill Lane
- ubitricity Distributed Energy Systems UK Ltd. 4 Coleridge Avenue, Opp.
- Westcroft Leisure Centre
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 1 Saint Johns Road, junc Green Wrythe Lane · 45p per kWh · 5 kW · 0.1 mi