# 105 Crofton Road · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-105-crofton-road-uk

105 Crofton Road is an EV charging site in Peckham, Greater London, run by Char.gy. It has a single 4 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 105 Crofton Road, SE5 8LZ
- **Area:** Peckham, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.47046, -0.07889
- **Getting there:** PR Permit Holders Only: Mon - Fri, 08:30 - 18:30

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 4 kW | 1 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at 105 Crofton Road (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at 105 Crofton Road (Char.gy)?

Up to 4 kW AC via Type 2.

### How many charging sockets does 105 Crofton Road (Char.gy) have?

1 charging socket: 1 × 4 kW Type 2.

### Who operates 105 Crofton Road?

105 Crofton Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at 105 Crofton Road (Char.gy)?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 105 Crofton Road (Char.gy)?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at 105 Crofton Road (Char.gy)?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Peckham](https://ampmap.co.uk/chargers/united-kingdom/greater-london/peckham)
- [Cheapest charging in Peckham](https://ampmap.co.uk/chargers/united-kingdom/greater-london/peckham/cheapest)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [93 Crofton Road · Char.gy](https://ampmap.co.uk/charger/char-gy-93-crofton-road-uk) - Type 2 5 kW · 93 Crofton Road
- [ubitricity Distributed Energy Systems UK Ltd. 52 Lyndhurst Grove, Opp.](https://ampmap.co.uk/charger/ubitricity-52-lyndhurst-grove-opp-uk) - Ubitricity · Type 2 5 kW · 52 Lyndhurst Grove, Opp. · From 45p/kWh
- [Lyndhurst Grove · Char.gy](https://ampmap.co.uk/charger/char-gy-lyndhurst-grove-2-uk) - Type 2 4 kW · Lyndhurst Grove
- [ubitricity Distributed Energy Systems UK Ltd. 98 Bushey Hill Road](https://ampmap.co.uk/charger/ubitricity-98-bushey-hill-road-uk) - Ubitricity · Type 2 5 kW · 98 Bushey Hill Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 106B Bushey Hill Road](https://ampmap.co.uk/charger/ubitricity-106b-bushey-hill-road-uk) - Ubitricity · Type 2 5 kW · 106B Bushey Hill Road · From 45p/kWh
- [110 Shenley Road · Char.gy](https://ampmap.co.uk/charger/char-gy-110-shenley-road-uk) - Type 2 4 kW · 110 Shenley Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-105-crofton-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
