Char.gy · EV charging site
106-116 the Barley Lea-A
106 - 116 the Barley Lea - A, Coventry, CV3 1DY
106-116 the Barley Lea-A is an EV charging site in Coventry, run by Char.gy. It has a single 5 kW Type 2 socket. 44 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 26 Stoke Green (Opp. Tick-tock Park) (ESB Energy), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 28 Feb 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 106-116 the Barley Lea-A (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 106-116 the Barley Lea-A (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does 106-116 the Barley Lea-A (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates 106-116 the Barley Lea-A?
106-116 the Barley Lea-A is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 106-116 the Barley Lea-A (Char.gy)?
26 Stoke Green (Opp. Tick-tock Park) (ESB Energy) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 106-116 the Barley Lea-A (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 106-116 the Barley Lea-A (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 106-116 the Barley Lea-A (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 118-128 the Barley Lea-A
- 105-115 the Barley Lea
- 136 the Barley Lea-A
- 141 the Barley Lea
- 153-163 the Barley Lea
- Corner of the Barley Lea & the Moorfield
- Fastest nearby
- 136 the Barley Lea-A · 22 kW · 40 yd