# 138 Bordesley Road · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-138-bordesley-road-uk

138 Bordesley Road is an EV charging site in Morden, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 138 Bordesley Road, SM4 5LT
- **Area:** Morden, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.39740, -0.19507
- **Getting there:** Permit holders M2 mon -fri 10am-4pm

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 5 kW | 1 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at 138 Bordesley Road (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at 138 Bordesley Road (Char.gy)?

Up to 5 kW AC via Type 2.

### How many charging sockets does 138 Bordesley Road (Char.gy) have?

1 charging socket: 1 × 5 kW Type 2.

### Who operates 138 Bordesley Road?

138 Bordesley Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at 138 Bordesley Road (Char.gy)?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 138 Bordesley Road (Char.gy)?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at 138 Bordesley Road (Char.gy)?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Morden](https://ampmap.co.uk/chargers/united-kingdom/greater-london/morden)
- [Cheapest charging in Morden](https://ampmap.co.uk/chargers/united-kingdom/greater-london/morden/cheapest)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [2 Bodmin Grove · Char.gy](https://ampmap.co.uk/charger/char-gy-2-bodmin-grove-uk) - Type 2 4 kW · 2 Bodmin Grove
- [1 Alnwick Grove · Char.gy](https://ampmap.co.uk/charger/char-gy-1-alnwick-grove-uk) - Type 2 4 kW · 1 Alnwick Grove
- [58 Blanchland Road · Char.gy](https://ampmap.co.uk/charger/char-gy-58-blanchland-road-uk) - Type 2 5 kW · 58 Blanchland Road
- [Outside 38 Buckfast Road · Char.gy](https://ampmap.co.uk/charger/char-gy-outside-38-buckfast-road-uk) - Type 2 4 kW · Outside 38 Buckfast Road
- [ubitricity Distributed Energy Systems UK Ltd. 12 Morden Court, Outside No 12](https://ampmap.co.uk/charger/ubitricity-12-morden-court-outside-no-12-uk) - Ubitricity · Type 2 5 kW · 12 Morden Court, Outside No 12 · From 45p/kWh
- [Morden Court · SureCharge](https://ampmap.co.uk/charger/surecharge-morden-court-uk) - Type 2 4 kW · Morden Court

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-138-bordesley-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 6 Jul 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
