Char.gy · EV charging site
17 the Coppice
17 the Coppice, Coventry, CV3 1EL
17 the Coppice is an EV charging site in Coventry, run by Char.gy. It has a single 3 kW Type 2 socket. 49 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 26 Stoke Green (Opp. Tick-tock Park) (ESB Energy), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 1 Mar 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 17 the Coppice (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 17 the Coppice (Char.gy)?
Up to 3 kW AC via Type 2.
How many charging sockets does 17 the Coppice (Char.gy) have?
1 charging socket: 1 × 3 kW Type 2.
Who operates 17 the Coppice?
17 the Coppice is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 17 the Coppice (Char.gy)?
26 Stoke Green (Opp. Tick-tock Park) (ESB Energy) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 17 the Coppice (Char.gy)?
A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 17 the Coppice (Char.gy)?
A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 17 the Coppice (Char.gy)?
A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 7 the Coppice
- Corner of the Barley Lea & the Moorfield
- 20 the Coppice
- 153-163 the Barley Lea
- 136 the Barley Lea-A
- 118-128 the Barley Lea-A
- Fastest nearby
- 136 the Barley Lea-A · 22 kW · 0.2 mi