Char.gy · EV charging site
2 Dennis Road-A
2 Dennis Road - A, Coventry, CV2 3GF
2 Dennis Road-A is an EV charging site in Coventry, run by Char.gy. It has a single 22 kW Type 2 socket. 91 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 48-62 Clay Lane, Long Stay Car Park (ESB Energy), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 21 Nov 2026)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 2 Dennis Road-A (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 2 Dennis Road-A (Char.gy)?
Up to 22 kW AC via Type 2.
How many charging sockets does 2 Dennis Road-A (Char.gy) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates 2 Dennis Road-A?
2 Dennis Road-A is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 2 Dennis Road-A (Char.gy)?
48-62 Clay Lane, Long Stay Car Park (ESB Energy) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 2 Dennis Road-A (Char.gy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 2 Dennis Road-A (Char.gy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 2 Dennis Road-A (Char.gy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.