Char.gy · EV charging site
28 Berryfield Road
28 Berryfield Road, Pimlico, SE173QE
28 Berryfield Road is an EV charging site in Pimlico, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 352 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Kennington Park Rd Parking/Charging (Chargemaster), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 28 Feb 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Getting there
- E Permit Holders Only: Mon - Fri, 08:30 - 18:30
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 28 Berryfield Road (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 28 Berryfield Road (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does 28 Berryfield Road (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates 28 Berryfield Road?
28 Berryfield Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 28 Berryfield Road (Char.gy)?
Kennington Park Rd Parking/Charging (Chargemaster) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 28 Berryfield Road (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 28 Berryfield Road (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 28 Berryfield Road (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Berryfield Road
- 70 Penton Place
- 75 Penton Place
- 33 Penton Place
- 192 Manor Place
- ubitricity Distributed Energy Systems UK Ltd. 85 Penton Place
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 85 Penton Place · 56p per kWh · 5 kW · 110 yd