Char.gy · EV charging site
2B Vectis Road
2B Vectis Road, Furzedown, SW17 9RG
2B Vectis Road is an EV charging site in Furzedown, Greater London, run by Char.gy. It has a single 4 kW Type 2 socket. 226 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 16 Gleneagle Road, 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 27 May 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- Permit GC Mon - Fri 8:30am -6:30pmPay by Phone Max 10 hours
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 2B Vectis Road (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 2B Vectis Road (Char.gy)?
Up to 4 kW AC via Type 2.
How many charging sockets does 2B Vectis Road (Char.gy) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates 2B Vectis Road?
2B Vectis Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 2B Vectis Road (Char.gy)?
16 Gleneagle Road is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 2B Vectis Road (Char.gy)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 2B Vectis Road (Char.gy)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 2B Vectis Road (Char.gy)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Road Jersey, Junction With Links Road
- ubitricity Distributed Energy Systems UK Ltd. Road Ipswich, Junction With Seely Road
- 189 Links Road
- ubitricity Distributed Energy Systems UK Ltd. Road Hailsham, Junction With Seely Road
- Hailsham Road
- ubitricity Distributed Energy Systems UK Ltd. 224 Ribblesdale Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Jersey, Junction With Links Road · 67p per kWh · 5 kW · 100 yd
- Fastest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Jersey, Junction With Links Road · 5 kW · 100 yd