Char.gy · EV charging site
32 Baron Grove
32 Baron Grove, Mitcham, CR4 4EH
32 Baron Grove is an EV charging site in Mitcham, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 102 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Outside 91-103 London Road (BP Pulse), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 27 May 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- Permit MT Mon - Fri 11am -3pm
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 32 Baron Grove (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 32 Baron Grove (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does 32 Baron Grove (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates 32 Baron Grove?
32 Baron Grove is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 32 Baron Grove (Char.gy)?
Outside 91-103 London Road (BP Pulse) is 1.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 32 Baron Grove (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 32 Baron Grove (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 32 Baron Grove (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 32 Mitcham Park, Outside 32
- ubitricity Distributed Energy Systems UK Ltd. 1 Bramcote Avenue, Opposite 1
- 95 Brookfields Avenue
- ubitricity Distributed Energy Systems UK Ltd. Park Mitcham, Junction With London Road
- 50 Brookfields Avenue
- Cricket Green Outside Brook House
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 32 Mitcham Park, Outside 32 · 56p per kWh · 5 kW · 100 yd