# 42 Trothy Road · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-42-trothy-road-uk

42 Trothy Road is an EV charging site in Peckham, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 42 Trothy Road, SE1 5RR
- **Area:** Peckham, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.49137, -0.06610
- **Getting there:** TS Permit Holders Only: Mon - Fri, 08:30 - 18:30

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 5 kW | 1 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at 42 Trothy Road (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at 42 Trothy Road (Char.gy)?

Up to 5 kW AC via Type 2.

### How many charging sockets does 42 Trothy Road (Char.gy) have?

1 charging socket: 1 × 5 kW Type 2.

### Who operates 42 Trothy Road?

42 Trothy Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at 42 Trothy Road (Char.gy)?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 42 Trothy Road (Char.gy)?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at 42 Trothy Road (Char.gy)?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Peckham](https://ampmap.co.uk/chargers/united-kingdom/greater-london/peckham)
- [Cheapest charging in Peckham](https://ampmap.co.uk/chargers/united-kingdom/greater-london/peckham/cheapest)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [19 Trothy Road · Char.gy](https://ampmap.co.uk/charger/char-gy-19-trothy-road-uk) - Type 2 5 kW · 19 Trothy Road
- [1 Strathnairn Street · Char.gy](https://ampmap.co.uk/charger/char-gy-1-strathnairn-street-uk) - Type 2 5 kW · 1 Strathnairn Street
- [Townsend House · Char.gy](https://ampmap.co.uk/charger/char-gy-townsend-house-uk) - Type 2 5 kW · Townsend House
- [186 Simms Road · Char.gy](https://ampmap.co.uk/charger/char-gy-186-simms-road-uk) - Type 2 5 kW · 186 Simms Road
- [13 Monnow Road · Char.gy](https://ampmap.co.uk/charger/char-gy-13-monnow-road-uk) - Type 2 5 kW · 13 Monnow Road
- [184 Southwark Park Road · Total Energies](https://ampmap.co.uk/charger/total-energies-184-southwark-park-road-uk) - Type 2 7 kW, J-1772 4 kW · 184 Southwark Park Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-42-trothy-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 27 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
