Char.gy · EV charging site
45 Aldbridge Street
45 Aldbridge Street, Peckham, SE17 2RG
45 Aldbridge Street is an EV charging site in Peckham, Greater London, run by Char.gy. It has a single 4 kW Type 2 socket. 468 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] 76-80 Tower Bridge Road (BP Pulse), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 14 Mar 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- M1 Permits Holders Only: Mon - Fri, 08.30 - 18.30
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 45 Aldbridge Street (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 45 Aldbridge Street (Char.gy)?
Up to 4 kW AC via Type 2.
How many charging sockets does 45 Aldbridge Street (Char.gy) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates 45 Aldbridge Street?
45 Aldbridge Street is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 45 Aldbridge Street (Char.gy)?
[E-TAXI ONLY] 76-80 Tower Bridge Road (BP Pulse) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 45 Aldbridge Street (Char.gy)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 45 Aldbridge Street (Char.gy)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 45 Aldbridge Street (Char.gy)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Opposite 54 Surrey Square
- Flinton Street
- ubitricity Distributed Energy Systems UK Ltd. 56 Surrey Square, opp. Primary School
- Amery House
- ubitricity Distributed Energy Systems UK Ltd. 22 Kinglake Street, outside Amery House
- Hadlow House
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 56 Surrey Square, opp. Primary School · 56p per kWh · 5 kW · 110 yd
- Fastest nearby
- ubitricity Distributed Energy Systems UK Ltd. 56 Surrey Square, opp. Primary School · 5 kW · 110 yd