Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Char.gy · EV charging site

46 Sydney Road

Sydney Road, Wimbledon, SW20 8EF

46 Sydney Road is an EV charging site in Wimbledon, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 241 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Extra - New Malden, 1 mile away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 9 Dec 2023Last verified 9 Dec 2023

Connectors

Type 2 · 5 kW1 connector

Site information

Operator
Char.gy
Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)
Phone (from Open Charge Map)
0800 086 9606

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 5 kW Type 2~11h 4m
Tesla Model 3 Rear-Wheel Drive 10–80% · 5 kW Type 2~7h 59m
Audi Q4 e-tron 50 10–80% · 5 kW Type 2~10h 13m
Hyundai IONIQ 5 10–80% · 5 kW Type 2~10h 10m
MG Motor MG4 Trophy 10–80% · 5 kW Type 2~8h 32m
Hyundai Kona Electric Long Range 10–80% · 5 kW Type 2~8h 7m
Nissan LEAF 10–80% · 5 kW Type 2~5h 36m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at 46 Sydney Road (Char.gy)?

Up to 5 kW AC via Type 2.

How many charging sockets does 46 Sydney Road (Char.gy) have?

1 charging socket: 1 × 5 kW Type 2.

Who operates 46 Sydney Road?

46 Sydney Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

Where is the nearest charger with 50 kW or more to 46 Sydney Road (Char.gy)?

Pod Point Tesco Extra - New Malden is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at 46 Sydney Road (Char.gy)?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 46 Sydney Road (Char.gy)?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at 46 Sydney Road (Char.gy)?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 9 Dec 2023

Amp Map does not take payment. You pay the operator.