# 50 Windmill Road-A · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-50-windmill-road-a-uk

50 Windmill Road-A is an EV charging site in Bedworth, Warwickshire, run by Char.gy. It has a single 22 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 50 Windmill Road - A, CV6 7BP
- **Area:** Bedworth, Warwickshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.44430, -1.48671

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 1 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at 50 Windmill Road-A (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at 50 Windmill Road-A (Char.gy)?

Up to 22 kW AC via Type 2.

### How many charging sockets does 50 Windmill Road-A (Char.gy) have?

1 charging socket: 1 × 22 kW Type 2.

### Who operates 50 Windmill Road-A?

50 Windmill Road-A is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at 50 Windmill Road-A (Char.gy)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 50 Windmill Road-A (Char.gy)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at 50 Windmill Road-A (Char.gy)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bedworth](https://ampmap.co.uk/chargers/united-kingdom/warwickshire/bedworth)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [Windmill Road, Coventry 1 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-windmill-road-coventry-1-uk) - Type 2 7 kW · Windmill Road
- [2 Elmhurst Road · Char.gy](https://ampmap.co.uk/charger/char-gy-2-elmhurst-road-uk) - Type 2 3 kW · 2 Elmhurst Road
- [171 Longford Road · Char.gy](https://ampmap.co.uk/charger/char-gy-171-longford-road-uk) - Type 2 3 kW · 171 Longford Road
- [175 Longford Road · Char.gy](https://ampmap.co.uk/charger/char-gy-175-longford-road-uk) - Type 2 3 kW · 175 Longford Road
- [The Croft · Char.gy](https://ampmap.co.uk/charger/char-gy-the-croft-uk) - Type 2 3 kW · The Croft
- [Bedlam Lane 1 · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-bedlam-lane-1-uk) - Type 2 7 kW · Bedlam Lane

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-50-windmill-road-a-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 21 Nov 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
