# 55-57 Rutland Road · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-55-57-rutland-road-uk

55-57 Rutland Road is an EV charging site in Harrow, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 55 - 57 Rutland Road, HA1 4JN
- **Area:** Harrow, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.58362, -0.34993
- **Getting there:** Permit Holders Only: U Monday-Friday (10:00 - 11:00 and 14:00-15:00)

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 5 kW | 1 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at 55-57 Rutland Road (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at 55-57 Rutland Road (Char.gy)?

Up to 5 kW AC via Type 2.

### How many charging sockets does 55-57 Rutland Road (Char.gy) have?

1 charging socket: 1 × 5 kW Type 2.

### Who operates 55-57 Rutland Road?

55-57 Rutland Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at 55-57 Rutland Road (Char.gy)?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 55-57 Rutland Road (Char.gy)?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at 55-57 Rutland Road (Char.gy)?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Harrow](https://ampmap.co.uk/chargers/united-kingdom/greater-london/harrow)
- [Cheapest charging in Harrow](https://ampmap.co.uk/chargers/united-kingdom/greater-london/harrow/cheapest)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [42-44 Rutland Road · Char.gy](https://ampmap.co.uk/charger/char-gy-42-44-rutland-road-uk) - Type 2 5 kW · 42 - 44 Rutland Road
- [53-55 Bedford Road · Char.gy](https://ampmap.co.uk/charger/char-gy-53-55-bedford-road-uk) - Type 2 5 kW · 53 - 55 Bedford Road
- [38-40 Oxford Road · Char.gy](https://ampmap.co.uk/charger/char-gy-38-40-oxford-road-uk) - Type 2 5 kW · 38 - 40 Oxford Road
- [12-14 Sussex Road · Char.gy](https://ampmap.co.uk/charger/char-gy-12-14-sussex-road-uk) - Type 2 5 kW · 12 - 14 Sussex Road
- [44-46 Bedford Road · Char.gy](https://ampmap.co.uk/charger/char-gy-44-46-bedford-road-uk) - Type 2 5 kW · 44 - 46 Bedford Road
- [18-20 Oxford Road · Char.gy](https://ampmap.co.uk/charger/char-gy-18-20-oxford-road-uk) - Type 2 5 kW · 18 - 20 Oxford Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-55-57-rutland-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 28 Feb 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
