# 7 the Coppice · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-7-the-coppice-uk

7 the Coppice is an EV charging site in Coventry, run by Char.gy. It has a single 3 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 7 the Coppice, CV3 1DH
- **Area:** Coventry, United Kingdom
- **Coordinates (latitude, longitude):** 52.39522, -1.47627

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 3 kW | 1 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at 7 the Coppice (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at 7 the Coppice (Char.gy)?

Up to 3 kW AC via Type 2.

### How many charging sockets does 7 the Coppice (Char.gy) have?

1 charging socket: 1 × 3 kW Type 2.

### Who operates 7 the Coppice?

7 the Coppice is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at 7 the Coppice (Char.gy)?

A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 7 the Coppice (Char.gy)?

A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at 7 the Coppice (Char.gy)?

A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Coventry](https://ampmap.co.uk/chargers/united-kingdom/coventry/coventry)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [17 the Coppice · Char.gy](https://ampmap.co.uk/charger/char-gy-17-the-coppice-uk) - Type 2 3 kW · 17 the Coppice
- [20 the Coppice · Char.gy](https://ampmap.co.uk/charger/char-gy-20-the-coppice-uk) - Type 2 3 kW · 20 the Coppice
- [Corner of the Barley Lea & the Moorfield · Char.gy](https://ampmap.co.uk/charger/char-gy-corner-of-the-barley-lea-and-the-moorfield-uk) - Type 2 3 kW · Corner of the Barley Lea & the Moorfield
- [153-163 the Barley Lea · Char.gy](https://ampmap.co.uk/charger/char-gy-153-163-the-barley-lea-uk) - Type 2 3 kW · 153 - 163 the Barley Lea
- [136 the Barley Lea-A · Char.gy](https://ampmap.co.uk/charger/char-gy-136-the-barley-lea-a-uk) - Type 2 22 kW · 136 the Barley Lea - A
- [118-128 the Barley Lea-A · Char.gy](https://ampmap.co.uk/charger/char-gy-118-128-the-barley-lea-a-uk) - Type 2 5 kW · 118 - 128 the Barley Lea - A

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-7-the-coppice-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
