Char.gy · EV charging site
87 Commercial Way
87 Commercial Way, Peckham, SE15 6DB
87 Commercial Way is an EV charging site in Peckham, Greater London, run by Char.gy. It has a single 4 kW Type 2 socket. 549 other charging sites are listed within a mile, and the nearest site with 50 kW or more is LIDL Peckham, 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 18 Apr 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- R Permit Holders Only: Mon - Fri, 08:30 - 18:30
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at 87 Commercial Way (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at 87 Commercial Way (Char.gy)?
Up to 4 kW AC via Type 2.
How many charging sockets does 87 Commercial Way (Char.gy) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates 87 Commercial Way?
87 Commercial Way is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to 87 Commercial Way (Char.gy)?
LIDL Peckham is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 87 Commercial Way (Char.gy)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 87 Commercial Way (Char.gy)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 87 Commercial Way (Char.gy)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Opposite 171 Cator Street
- 2 Jowett Street
- Opposite 238 Sumner Road
- Opposite Boathouse Walk
- Opposite 21 Kelly Avenue
- 47 Carisbrooke Gardens
- Fastest nearby
- Opposite 238 Sumner Road · 5 kW · 0.1 mi