Char.gy · EV charging site
Bromleigh Drive
Bromleigh Drive, Coventry, CV2 5LY
Bromleigh Drive is an EV charging site in Coventry, run by Char.gy. It has a single 3 kW Type 2 socket. 92 other charging sites are listed within a mile, and the nearest site with 50 kW or more is New Pippin (Wyken) (evyve), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 28 Feb 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Bromleigh Drive (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Bromleigh Drive (Char.gy)?
Up to 3 kW AC via Type 2.
How many charging sockets does Bromleigh Drive (Char.gy) have?
1 charging socket: 1 × 3 kW Type 2.
Who operates Bromleigh Drive?
Bromleigh Drive is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Bromleigh Drive (Char.gy)?
New Pippin (Wyken) (evyve) is 0.7 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Bromleigh Drive (Char.gy)?
A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bromleigh Drive (Char.gy)?
A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Bromleigh Drive (Char.gy)?
A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 93 Momus Blvd
- 125 Momus Boulevard
- Corner of Sapphire Gate & Lord Lytton Avenue
- Opposite 2 Lord Lytton Avenue-B
- 142 Longfellow Road
- Opposite 47 Meredith Road-A
- Fastest nearby
- Opposite 2 Lord Lytton Avenue-B · 22 kW · 0.1 mi