Char.gy · EV charging site
Durnsford Avenue J/W Ashen Grove
Durnsford Avenue J/W Ashen Grove, Earlsfield, SW19 8BH
Durnsford Avenue J/W Ashen Grove is an EV charging site in Earlsfield, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 219 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Plough Lane, 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 27 May 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- Permit P2 Mon-Fri 1100-1500
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Durnsford Avenue J/W Ashen Grove (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Durnsford Avenue J/W Ashen Grove (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does Durnsford Avenue J/W Ashen Grove (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Durnsford Avenue J/W Ashen Grove?
Durnsford Avenue J/W Ashen Grove is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Durnsford Avenue J/W Ashen Grove (Char.gy)?
Shell Recharge Shell Plough Lane is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Durnsford Avenue J/W Ashen Grove (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Durnsford Avenue J/W Ashen Grove (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Durnsford Avenue J/W Ashen Grove (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Wolsely Road
- ubitricity Distributed Energy Systems UK Ltd. 79 Wolseley Avenue, Junction With 79 Ashen Gr
- Havana Road to the Side of 37 Wellington Road
- 1a Gordondale Road
- Alverstone Avenue
- 45 Durnsford Avenue
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 79 Wolseley Avenue, Junction With 79 Ashen Gr · 45p per kWh · 5 kW · 70 yd