Char.gy · EV charging site
Essex Engineering Works
Essex Engineering Works, Leytonstone, E11 2AX
Essex Engineering Works is an EV charging site in Leytonstone, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 120 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Toby Carvery Snaresbrook (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 28 Feb 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Getting there
- Resident Permit Holders - WD - Mon-Fri 08:30-18:30
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Essex Engineering Works (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Essex Engineering Works (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does Essex Engineering Works (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Essex Engineering Works?
Essex Engineering Works is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Essex Engineering Works (Char.gy)?
Toby Carvery Snaresbrook (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Essex Engineering Works (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Essex Engineering Works (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Essex Engineering Works (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 84 Halstead Road
- ubitricity Distributed Energy Systems UK Ltd. Nelson Road,Outside Essex engineering
- ubitricity Distributed Energy Systems UK Ltd. 7 Nelson Road
- Nelson Road
- ubitricity Distributed Energy Systems UK Ltd. 1A Nelson Road
- ubitricity Distributed Energy Systems UK Ltd. 36 Wellington Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 84 Halstead Road · 56p per kWh · 5 kW · 20 yd
- Fastest nearby
- Nelson Road · 6 kW · 80 yd