Char.gy · EV charging site
Generator Business Centre, Miles Road
Miles Road, Mitcham, CR4 3FH
Generator Business Centre, Miles Road is an EV charging site in Mitcham, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 148 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] 34 Christchurch Road (BP Pulse), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- 0800 086 9606
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Generator Business Centre, Miles Road (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does Generator Business Centre, Miles Road (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Generator Business Centre, Miles Road?
Generator Business Centre, Miles Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Generator Business Centre, Miles Road (Char.gy)?
[E-TAXI ONLY] 34 Christchurch Road (BP Pulse) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Generator Business Centre, Miles Road (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Generator Business Centre, Miles Road (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Generator Business Centre, Miles Road (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Road Portland, Junction With Seaton Road
- 47 Portland Road
- 1 Glebe Avenue
- ubitricity Distributed Energy Systems UK Ltd. 32 Glebe Path, Outside 32
- Opposite 44 Belgrave Walk
- Bank Avenue
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Portland, Junction With Seaton Road · 56p per kWh · 5 kW · 0.1 mi