Char.gy · EV charging site
Kenwyn Road
Kenwyn Road, Wimbledon, SW20 8TR
Kenwyn Road is an EV charging site in Wimbledon, Greater London (SW20 8TR), run by Char.gy. It has a single 4 kW Type 2 socket. Amp Map lists 1 other charge point named Kenwyn Road in Wimbledon. 200 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Extra - New Malden, 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 27 May 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- Permit RPN Mon - Fri 8:30am -6:30pm
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Kenwyn Road (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Kenwyn Road (Char.gy)?
Up to 4 kW AC via Type 2.
How many charging sockets does Kenwyn Road (Char.gy) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Kenwyn Road?
Kenwyn Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Kenwyn Road (Char.gy)?
Pod Point Tesco Extra - New Malden is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kenwyn Road (Char.gy)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kenwyn Road (Char.gy)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kenwyn Road (Char.gy)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Opposite 19 Rosevine Road
- Pendarves Road By 120 Lambton Road
- Outside 48 Trewince Road
- ubitricity Distributed Energy Systems UK Ltd. 95 Kenwyn Road, Side Of 95 Pepys Road
- Kenwyn Road
- Amity Grove
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 95 Kenwyn Road, Side Of 95 Pepys Road · 67p per kWh · 5 kW · 130 yd
- Fastest nearby
- ubitricity Distributed Energy Systems UK Ltd. 95 Kenwyn Road, Side Of 95 Pepys Road · 5 kW · 130 yd