Char.gy · EV charging site
Mainwaring Court, Armfield Crescent
Armfield Crescent, Mitcham, CR4 2JW
Mainwaring Court, Armfield Crescent is an EV charging site in Mitcham, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 206 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] 34 Christchurch Road (BP Pulse), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- 0800 086 9606
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Mainwaring Court, Armfield Crescent (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does Mainwaring Court, Armfield Crescent (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Mainwaring Court, Armfield Crescent?
Mainwaring Court, Armfield Crescent is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Mainwaring Court, Armfield Crescent (Char.gy)?
[E-TAXI ONLY] 34 Christchurch Road (BP Pulse) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Mainwaring Court, Armfield Crescent (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Mainwaring Court, Armfield Crescent (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Mainwaring Court, Armfield Crescent (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Opposite 59 Feltham Road
- Feltham Road
- ubitricity Distributed Energy Systems UK Ltd. 2 Feltham Road, Outside 2
- ubitricity Distributed Energy Systems UK Ltd. 5 Armfield Road, Opposite 5
- ubitricity Distributed Energy Systems UK Ltd. Crescent Armfield, Junction With London Road
- ubitricity Distributed Energy Systems UK Ltd. 19 Carew Road, Outside 19
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 2 Feltham Road, Outside 2 · 45p per kWh · 5 kW · 120 yd