Char.gy · EV charging site
Marketing
Marketing, Solihull, E1 6LT
Marketing is an EV charging site in Solihull, run by Char.gy. It has a single 2 kW Type 2 socket. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is NEC Ultrafast Charging Hub (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 4 Jul 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Marketing (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Marketing (Char.gy)?
Up to 2 kW AC via Type 2.
How many charging sockets does Marketing (Char.gy) have?
1 charging socket: 1 × 2 kW Type 2.
Who operates Marketing?
Marketing is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Marketing (Char.gy)?
NEC Ultrafast Charging Hub (BP Pulse) is 0.3 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Marketing (Char.gy)?
A 10–80% charge takes about 27h 39m on the 2 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Marketing (Char.gy)?
A 10–80% charge takes about 19h 57m on the 2 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Marketing (Char.gy)?
A 10–80% charge takes about 25h 33m on the 2 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- NEC Express Parking 1
- Pod Point AC Marriott Birmingham NEC and Airport
- NEC EV Park & Charge
- NEC Ultrafast Charging Hub
- Pod Point Resorts World Birmingham (Located on Floor B)
- Pod Point Genting Hotel Car Park - Resorts World Birmingham (VIP Hotel Parking Only)
- Cheapest nearby
- Pod Point Genting Hotel Car Park - Resorts World Birmingham (VIP Hotel Parking Only) · 30p per kWh · 22 kW · 0.4 mi
- Fastest nearby
- NEC Ultrafast Charging Hub · 300 kW · 0.3 mi