# Meadow Road · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-meadow-road-uk

Meadow Road is an EV charging site in Wimbledon, Greater London, run by Char.gy. It has a single 3 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Meadow Road, SW19 2ND
- **Area:** Wimbledon, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.41509, -0.18579
- **Getting there:** Mon-Fri 08:00-18:30 - Permit SW

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 3 kW | 1 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at Meadow Road (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Meadow Road (Char.gy)?

Up to 3 kW AC via Type 2.

### How many charging sockets does Meadow Road (Char.gy) have?

1 charging socket: 1 × 3 kW Type 2.

### Who operates Meadow Road?

Meadow Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at Meadow Road (Char.gy)?

A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Meadow Road (Char.gy)?

A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Meadow Road (Char.gy)?

A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Wimbledon](https://ampmap.co.uk/chargers/united-kingdom/greater-london/wimbledon)
- [Cheapest charging in Wimbledon](https://ampmap.co.uk/chargers/united-kingdom/greater-london/wimbledon/cheapest)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [58 Abbey Road · Char.gy](https://ampmap.co.uk/charger/char-gy-58-abbey-road-uk) - Type 2 5 kW · 58 Abbey Road
- [36 Dane Road · Char.gy](https://ampmap.co.uk/charger/char-gy-36-dane-road-uk) - Type 2 5 kW · 36 Dane Road
- [22 Mill Road · Char.gy](https://ampmap.co.uk/charger/char-gy-22-mill-road-uk) - Type 2 5 kW · 22 Mill Road
- [Mill Road · Total Energies](https://ampmap.co.uk/charger/total-energies-mill-road-uk) - Type 2 7 kW, J-1772 3 kW · Mill Road
- [Grove Road · Char.gy](https://ampmap.co.uk/charger/char-gy-grove-road-2-uk) - Type 2 5 kW · Grove Road
- [16 Norman Road · Char.gy](https://ampmap.co.uk/charger/char-gy-16-norman-road-uk) - Type 2 5 kW · 16 Norman Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-meadow-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
