# Melton Court · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-melton-court-uk

Melton Court is an EV charging site in Croydon, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Melton Court, CR0 6QP
- **Area:** Croydon, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.37668, -0.07799
- **Getting there:** EV Bays - EO Permit Holders, Mon - Sat 09:00-17:00 or pay at machine

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 5 kW | 1 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at Melton Court (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Melton Court (Char.gy)?

Up to 5 kW AC via Type 2.

### How many charging sockets does Melton Court (Char.gy) have?

1 charging socket: 1 × 5 kW Type 2.

### Who operates Melton Court?

Melton Court is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at Melton Court (Char.gy)?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Melton Court (Char.gy)?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Melton Court (Char.gy)?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Croydon](https://ampmap.co.uk/chargers/united-kingdom/greater-london/croydon)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [34 Elgin Road · Char.gy](https://ampmap.co.uk/charger/char-gy-34-elgin-road-uk) - Type 2 3 kW · 34 Elgin Road
- [Outram Road · Believ](https://ampmap.co.uk/charger/believ-outram-road-uk) - Type 2 22 kW · Outram Road
- [93 Clyde Road · Char.gy](https://ampmap.co.uk/charger/char-gy-93-clyde-road-uk) - Type 2 5 kW · 93 Clyde Road
- [Addiscombe Court Road · Char.gy](https://ampmap.co.uk/charger/char-gy-addiscombe-court-road-uk) - Type 2 3 kW · Addiscombe Court Road
- [Leslie Park Road · Believ](https://ampmap.co.uk/charger/believ-leslie-park-road-uk) - Type 2 22 kW · Leslie Park Road
- [Sundridge Road · Believ](https://ampmap.co.uk/charger/believ-sundridge-road-uk) - Type 2 22 kW · Sundridge Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-melton-court-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
