# Nelson Road · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-nelson-road-2-uk

Nelson Road is an EV charging site in Leytonstone, Greater London, run by Char.gy. It has a single 6 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Nelson Road, E11 2AX
- **Area:** Leytonstone, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.58316, 0.02648
- **Getting there:** Resident Permit Holders - WD - Mon-Fri 08:30-18:30

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 6 kW | 1 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at Nelson Road (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Nelson Road (Char.gy)?

Up to 6 kW AC via Type 2.

### How many charging sockets does Nelson Road (Char.gy) have?

1 charging socket: 1 × 6 kW Type 2.

### Who operates Nelson Road?

Nelson Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at Nelson Road (Char.gy)?

A 10–80% charge takes about 9h 13m on the 6 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nelson Road (Char.gy)?

A 10–80% charge takes about 6h 39m on the 6 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Nelson Road (Char.gy)?

A 10–80% charge takes about 8h 31m on the 6 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Leytonstone](https://ampmap.co.uk/chargers/united-kingdom/greater-london/leytonstone)
- [Cheapest charging in Leytonstone](https://ampmap.co.uk/chargers/united-kingdom/greater-london/leytonstone/cheapest)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 7 Nelson Road](https://ampmap.co.uk/charger/ubitricity-7-nelson-road-uk) - Ubitricity · Type 2 5 kW · 7 Nelson Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 1A Nelson Road](https://ampmap.co.uk/charger/ubitricity-1a-nelson-road-uk) - Ubitricity · Type 2 5 kW · 1A Nelson Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 84 Halstead Road](https://ampmap.co.uk/charger/ubitricity-84-halstead-road-uk) - Ubitricity · Type 2 5 kW · 84 Halstead Road · From 45p/kWh
- [Essex Engineering Works · Char.gy](https://ampmap.co.uk/charger/char-gy-essex-engineering-works-uk) - Type 2 5 kW · Essex Engineering Works
- [ubitricity Distributed Energy Systems UK Ltd. Nelson Road,Outside Essex engineering](https://ampmap.co.uk/charger/ubitricity-nelson-road-outside-essex-engineering-uk) - Ubitricity · Type 2 5 kW · Nelson Road,Outside Essex engineering · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 36 Wellington Road](https://ampmap.co.uk/charger/ubitricity-36-wellington-road-uk) - Ubitricity · Type 2 5 kW · 36 Wellington Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-nelson-road-2-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 27 Feb 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
