Char.gy · EV charging site
New Place Square
New Place Square, Shadwell, SE16 2EW
New Place Square is an EV charging site in Shadwell, Greater London (SE16 2EW), run by Char.gy. It has a single 3 kW Type 2 socket. Amp Map lists 1 other charge point named New Place Square in Shadwell. 274 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] 76-80 Tower Bridge Road (BP Pulse), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 1 Mar 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- G Resident Permit Holders Only: Mon - Fri, 08:30 - 18:30
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at New Place Square (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at New Place Square (Char.gy)?
Up to 3 kW AC via Type 2.
How many charging sockets does New Place Square (Char.gy) have?
1 charging socket: 1 × 3 kW Type 2.
Who operates New Place Square?
New Place Square is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to New Place Square (Char.gy)?
[E-TAXI ONLY] 76-80 Tower Bridge Road (BP Pulse) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at New Place Square (Char.gy)?
A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at New Place Square (Char.gy)?
A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at New Place Square (Char.gy)?
A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- New Place Square · 5 kW · 110 yd