Char.gy · EV charging site
Opp 5 Byfield Rd
Opp 5 Byfield Rd, Coventry, CV6 1FH
Opp 5 Byfield Rd is an EV charging site in Coventry, run by Char.gy. It has a single 3 kW Type 2 socket. 111 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 487-489 Holyhead Road (ESB Energy), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 28 Feb 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Opp 5 Byfield Rd (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Opp 5 Byfield Rd (Char.gy)?
Up to 3 kW AC via Type 2.
How many charging sockets does Opp 5 Byfield Rd (Char.gy) have?
1 charging socket: 1 × 3 kW Type 2.
Who operates Opp 5 Byfield Rd?
Opp 5 Byfield Rd is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Opp 5 Byfield Rd (Char.gy)?
487-489 Holyhead Road (ESB Energy) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Opp 5 Byfield Rd (Char.gy)?
A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Opp 5 Byfield Rd (Char.gy)?
A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Opp 5 Byfield Rd (Char.gy)?
A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 151 Cedars Avenue
- Chelveston Road 1
- 487-489 Holyhead Road
- 97a Evenlode Crescent
- 64 Chelveston Road
- 94 Evenlode Crescent
- Fastest nearby
- 487-489 Holyhead Road · 50 kW · 0.1 mi