Char.gy · EV charging site
Opposite 10 Merevale Crescent
Merevale Crescent, Morden, SM4 6HL
Opposite 10 Merevale Crescent is an EV charging site in Morden, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 77 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Outside 209-219 London Road (BP Pulse), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- 0800 086 9606
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Opposite 10 Merevale Crescent (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does Opposite 10 Merevale Crescent (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Opposite 10 Merevale Crescent?
Opposite 10 Merevale Crescent is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Opposite 10 Merevale Crescent (Char.gy)?
Outside 209-219 London Road (BP Pulse) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Opposite 10 Merevale Crescent (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Opposite 10 Merevale Crescent (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Opposite 10 Merevale Crescent (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.