Char.gy · EV charging site
Opposite 111 Redesdale Avenue
140 Batsford Road, Coventry, CV61AU
Opposite 111 Redesdale Avenue is an EV charging site at 140 Batsford Road in Coventry, run by Char.gy. It has a single 4 kW Type 2 socket. Amp Map lists 1 other charge point named Opposite 111 Redesdale Avenue in Coventry. 109 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 16-4 Crampers Field (ESB Energy), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- 0800 086 9606
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Opposite 111 Redesdale Avenue (Char.gy)?
Up to 4 kW AC via Type 2.
How many charging sockets does Opposite 111 Redesdale Avenue (Char.gy) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates Opposite 111 Redesdale Avenue?
Opposite 111 Redesdale Avenue is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Opposite 111 Redesdale Avenue (Char.gy)?
16-4 Crampers Field (ESB Energy) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Opposite 111 Redesdale Avenue (Char.gy)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Opposite 111 Redesdale Avenue (Char.gy)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Opposite 111 Redesdale Avenue (Char.gy)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Opposite 111 Redesdale Avenue
- Opposite 90 Batsford Road
- Opp 45 Trensale Ave
- 44 Evenlode Crescent
- 48 Evenlode Crescent-B
- 55 Evenlode Crescent
- Fastest nearby
- 48 Evenlode Crescent-B · 22 kW · 0.1 mi