# Opposite 112 Bruce Road · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-opposite-112-bruce-road-uk

Opposite 112 Bruce Road is an EV charging site in Coventry, run by Char.gy. It has a single 4 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Opposite 112 Bruce Road, CV6 2LG
- **Area:** Coventry, United Kingdom
- **Coordinates (latitude, longitude):** 52.43233, -1.52305

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 4 kW | 1 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at Opposite 112 Bruce Road (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Opposite 112 Bruce Road (Char.gy)?

Up to 4 kW AC via Type 2.

### How many charging sockets does Opposite 112 Bruce Road (Char.gy) have?

1 charging socket: 1 × 4 kW Type 2.

### Who operates Opposite 112 Bruce Road?

Opposite 112 Bruce Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at Opposite 112 Bruce Road (Char.gy)?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Opposite 112 Bruce Road (Char.gy)?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Opposite 112 Bruce Road (Char.gy)?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Coventry](https://ampmap.co.uk/chargers/united-kingdom/coventry/coventry)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [Opposite 118 Bruce Road · Char.gy](https://ampmap.co.uk/charger/char-gy-opposite-118-bruce-road-uk) - Type 2 7 kW · Opposite 118 Bruce Road
- [Opposite 104 Bruce Road · Char.gy](https://ampmap.co.uk/charger/char-gy-opposite-104-bruce-road-uk) - Type 2 4 kW · Opposite 104 Bruce Road
- [Opposite 122 Bruce Road · Char.gy](https://ampmap.co.uk/charger/char-gy-opposite-122-bruce-road-uk) - Type 2 7 kW · Opposite 122 Bruce Road
- [94 Bruce Road-A · Char.gy](https://ampmap.co.uk/charger/char-gy-94-bruce-road-a-uk) - Type 2 4 kW · 94 Bruce Road - A
- [Opposite 139 Sadler Road · Char.gy](https://ampmap.co.uk/charger/char-gy-opposite-139-sadler-road-uk) - Type 2 3 kW · Opposite 139 Sadler Road
- [Opposite 16 Links Road · Char.gy](https://ampmap.co.uk/charger/char-gy-opposite-16-links-road-uk) - Type 2 3 kW · Opposite 16 Links Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-opposite-112-bruce-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
