Char.gy · EV charging site
Opposite 19 Sturry Street
Opposite 19 Sturry Street, Canary Wharf, E14 6DA
Opposite 19 Sturry Street is an EV charging site in Canary Wharf, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 467 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London, UK - Canary Wharf (Tesla), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 27 May 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- B3 Permit Holders Only: Mon - Fri, 08:30 - 17:30
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Opposite 19 Sturry Street (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Opposite 19 Sturry Street (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does Opposite 19 Sturry Street (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Opposite 19 Sturry Street?
Opposite 19 Sturry Street is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Opposite 19 Sturry Street (Char.gy)?
London, UK - Canary Wharf (Tesla) is 0.5 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Opposite 19 Sturry Street (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Opposite 19 Sturry Street (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Opposite 19 Sturry Street (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 68 Grundy Street
- ubitricity Distributed Energy Systems UK Ltd. 22 Kerbey Street, opp.
- ubitricity Distributed Energy Systems UK Ltd. 2 Kerbey Street
- 24-26 Duff Street
- Opposite Children and Family Centre
- ubitricity Distributed Energy Systems UK Ltd. 19 Duff Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 68 Grundy Street · 55p per kWh · 5 kW · 40 yd