Char.gy · EV charging site
Opposite 67 Stuart Road
Opposite 67 Stuart Road, Brockley, SE15 3BA
Opposite 67 Stuart Road is an EV charging site in Brockley, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 343 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG BP - Dulwich (GeniePoint), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 28 Feb 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Opposite 67 Stuart Road (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Opposite 67 Stuart Road (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does Opposite 67 Stuart Road (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Opposite 67 Stuart Road?
Opposite 67 Stuart Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Opposite 67 Stuart Road (Char.gy)?
MFG BP - Dulwich (GeniePoint) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Opposite 67 Stuart Road (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Opposite 67 Stuart Road (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Opposite 67 Stuart Road (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Opposite 4 Rye Road
- 15 Borland Road
- Newlands Academy
- Newlands Academy
- 14 Hichisson Road
- ubitricity Distributed Energy Systems UK Ltd. 1 Borland Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 1 Borland Road · 67p per kWh · 5 kW · 100 yd